← All job outcomes

Illustrated workflow

Put the checked revision in the issue pack.

Follow a drawing from its revision record through review, authorisation and the transmittal record.

Illustrated engineering workflows, with current product capabilities and the decisions for your people shown on each page.

The example

A revised drawing is ready for issue. This example keeps the selected revision and the intended recipients together for the authoriser.

Read the current scope ↓

Illustration of document comments, a prepared revision, an approval screen and an issue sheet on a desk.
Illustration, not a product screenshot or customer recording. The right document. The right issue. The image includes intended steps; the current limits below apply.

The illustrated steps

  1. Identify the drawing

    Check the job, drawing number and supplied revision against the document.

  2. Update the register

    Keep the revision in the drawing register with its issue information.

  3. Check the content

    The responsible engineer checks the drawing and resolves the review comments.

  4. Approve the issue

    The authoriser reviews the exact drawing revision and recipient list.

  5. Prepare the transmittal record

    Keep the approved issue and transmittal number together.

  6. Keep recipient evidence

    Record who received the issued drawings through the authorised issue process.

What is built, and where it stops

The engineer still checks the revision and the authoriser approves the issue. This illustration does not promise automatic title-block checking or drawing delivery.

Current product scope recorded 28 October 2026. Built, switched off means it is not switched on for customers yet. Coming means it is planned and not yet available.

Robert: Drawing registers, revisions and transmittals
Built, switched off

Keeps the drawing register with its revisions and numbers each transmittal issued.

Sarah: Issue packs prepared with recipient evidence
Built, switched off

Keeps an approved log of drawings issued, who received them and the transmittal number.

These scope statements use the same source as the Feature List in the procurement pack. Read the OpsWork specification →