Developers

Keep your grid position and hit every milestone, without a bigger development team.

Your job is to get your project to energisation and keep its grid position. We prepare the paperwork round it, and you approve it.

The work that gets in the way

The offer signing window is easy to miss

NESO says an unsigned Gate 2 offer can be rescinded and replaced by a Gate 1 offer. DNO-managed offers have their own response deadlines.

A 5 MVA demand application needs maturity evidence

Missing authority, land or project information can delay assessment while consultants assemble the pack.

A full cable study starts before the route is tested

Comparing route options first helps you choose which option to take into the detailed study.

What changes

Works with all three. Most useful first: HVCO, OpsWork, Letterbox.

Built around a working HV design firm

Saqib Shah has 16 years in HV design. Saqib Engineering is an ISO 9001 certified HV design consultancy in Rotherham.

Built by a UK HV design firm that handles G99 applications and cable route studies for renewable developers.

OpsWork runs in your own Microsoft 365 and Azure UK South. You approve what leaves.

HVCO puts sources beside values for your engineer to check.